The construction work for the Chatswood-Epping line looking north from the current (temporary) platform. The two newly laid tracks shown on the left will take trains to Epping through the tunnel portal just beyond the concrete overbridge in the mid distance. (23-Jul-2006)
[Copyright: Peter Ware]
The construction work for the Chatswood-Epping line looking north from the current (temporary) platform. The two newly laid tracks shown on the left will take trains to Epping through the tunnel portal just beyond the concrete overbridge in the mid distance.
Link