The tracks beyond Port Kembla extended to the Eastern Breakwater, and were used by construction and maintenance trains. (2000)
[Copyright: Winston Yang]

The tracks beyond Port Kembla extended to the Eastern Breakwater, and were
used by construction and maintenance trains.
Link