Sorry, user registration is not yet available!

NSW Railway Photos owned by David Sweeney

[Display as: Thumbnails Order by: Year]

Armidale 1999 A closer view of the yard diagram at the station.
Berowra 2001 The local panel at Berowra station.
Berrima Junction 2004 The train indicator diagram at the junction between the main line and the branch to the Berrima Cement Works.
Boggabri 1999 A view of the yard diagram.
Bondi Junction 2001 The local panel at Bondi Junction station.
Bundanoon 2004 A closer view of the station diagram.
Bundanoon 2004 The station diagram and safeworking instrument behind the lever frame.
Central 2000 A view of the yard control panel showing the country platforms.
Concord West 2000 A view of the interior of the old signal box.
Cronulla 2003 The station master's desk and signal diagram.
Emerald Hill 1999 A view of the yard diagram inside the signal boz.
Fassifern 2004 The train indicator diagram at Fassifern.
Fassifern 2004 The control panel at Fassifern, controlling the branch to the nearby Newstan Colliery.
Glenbrook 2000 A close-up view of the track indicator panel at Glenbrook.
Harden 2003 A signalling diagram of the section between Bowning and Harden.
Harden 2003 The train indicator diagram in Harden North signal box.
Harden 2003 The train indicator diagram in Harden South signal box.
Kootingal 1999 The yard diagram at lever frame on the platform.
Lidcombe 2000 A view of the interior of the old Lidcombe signal box, including the train indicator diagram.
Liverpool 2001 The diagram inside the signal box at Liverpool.
Martin Place 2001 The local panel at Martin Place station.
Merah North 1998 The yard diagram at Merah North.
Mindaribba 2003 The local control panel at Mindaribba.
Minimbah 2004 The local control panel at Minimbah.
Newbridge 2003 The local control panel at Newbridge.
Oatley 2004 The indicator diagram at Oatley station.
Oatley 2004 The signaller's clearing point list instructions at Oatley.
Orange 2003 The diagram inside the signal box at Orange.
Parramatta Road Crossing 2001 A more modern version of the control panel inside the signal box.
Penrith 2001 A view of the signaller's control desk at Penrith.
Picton 2004 The yard diagram at Picton.
Picton 2004 The train indicator diagram and lever frame at Picton signal box.
Queanbeyan 2003 The signal diagram for F Frame.
Queanbeyan 2003 The signal box diagram in 2003. The up dock siding and associated crossovers have been excised from the diagram.
Quipolly 1998 The local control panel at Quipolly.
Redfern 2001 A view of the indicator panel serving platform 12.
Rhodes 2001 A view of the emergency panel at Rhodes.
Richmond 2001 The signal control board at Richmond.
Sefton Park South Junction 2004 The diagram and points levers inside Sefton Park Junction signal box.
Sefton Park South Junction 2004 The lever pulling list onside the signal box.
Spring Ridge 1998 The location diagram inside the signal box.
Springwood 2000 The signaller's control desk at Springwood.
St Marys 2001 A view of the signaller's control desk at St Marys. Of note is that this is the point where the Main West reduces fro 4 tracks to 2.
Sulphide Junction 2005 Part of the large control panel at Sulphide Junction.
Sulphide Junction 2005 Part of the large control panel at Sulphide Junction.
Tamworth 1997 The yard diagram at West Tamworth. The former branch to Barraba enters from the right bottom.
Temora 2003 The Temora yard diagram.
Togar 1998 The local panel at Togar signal box.
Ulan 1999 The signal control board at Ulan, controlling the entry and exit of trains from the Ulan Coal Loader balloon loop.
Waterfall 2001 The signaller's control desk at Waterfall.
Wollongong 2000 The large signal control room at Wollongong.