Main facility: | Station (Closed) | ||||
Lines: |
Rand Branch |
||||
Location: | (146.9105°, -35.5159°) [exact] GDA94 | ||||
Distance: | 593.830 km from Sydney | ||||
History: |
|
||||
Photos: | 2001 | ||||
Description: | Ryan was a 15m platform on the up side of the line. There was also a loading bank and a level crossing with manual gates. | ||||
Current status: |