Ardglen | 2007 | The remains of the last of the amenities buildings for the workers at the nearby Ardglen Quarry. There was originally three or four of these buildings. |
Ardglen | 2007 | The old shower block from the workers amenities at Ardglen Quarry. |
Ardglen | 2007 | A peeling poster inside the remaining workers hut at the quarry. |
Ardglen | 2007 | A peeling poster inside the remaining workers building at the quarry. |
Ardglen Tunnel | 1990 | A track-side view of the down portal. |
Baerami | 2007 | The view from a down train.The fence can be seen deviating to the left to accomodate the station that was never built. |
Bee Siding | 2008 | The view from a southbound train about 2km to the north of Bee Siding. The remains of the double line are still present at the bridge. |
Bellbird Colliery | 2008 | The view as the line passes under the former Kalingo Branch bridge, looking towards the site of Bellbird Colliery in the distance. |
Ben Lomond | 1988 | The view from a passing ballast train, when the track was still open and being maintained. |
Borenore | 1990 | The view looking west along the platform. |
Boronia No 2 Tunnel | 2007 | One of the portals on the tunnel, as viewed from the front of a train. |
Boronia No 5 Tunnel | 2007 | The up portal of the abandoned tunnel. |
Bowmans Creek | 2007 | The probable location of Bowmans Creek, looking north. The deviated main line is visible on the right distance. |
Bowmans Creek | 2007 | The probable location of Bowmans Creek, looking south. |
Bowmans Creek | 2007 | The probable one-time location of Bowmans Creek. |
Branxton | 2009 | The interior of the signal box on the platform. At the left are the passing loops at Belford, while on the right is Branxton station. |
Burren | 2007 | The view of the elevated water tank looking west. The eastern leg of the triangle curves away on the left. The former loco servicing facilities (coal bunker, ash bit and engine shed) were located directly behind the tank. |
Burren | 2007 | The three staff boxes inside the staff hut. |
Burren | 2007 | The remains of the jib crane, next to the base of the former goods shed. |
Burren | 2007 | The view looking south over the triangle. The former ash pit is visible in the foreground. |
Emerald Hill | 2007 | The staff instruments inside the signal box. |
Emerald Hill | 2007 | A view of the interior of the signal box. |
Emerald Hill | 2007 | The staff hut sits on the truncated platform. |
Gap | 2009 | The staff for the section to Spring Ridge. |
Gap | 2009 | The inside of the new staff hut. |
Gap | 2009 | A driver performs safeworking procedures in the staff hut. |
Goobang Junction | 1990 | The former Goobang Junction West signal box. |
Gosford | 2008 | The gantry crane is still present in the yard. |
Gosford | 2008 | The large elevated water tank has been preserved in the newly-overhauled yard. |
Grasstree | 2008 | The location of the former station. It consisted of a pair of platforms where the passenger train is, and was made of old rail and concrete. |
Gulgong | 2008 | The Gulgong staff hut and ground frame. |
Gulgong | 2008 | The ground frame at the down end of the station. |
Gulgong | 2008 | The staff box for the section Gulgong-Dunedoo. |
Gulgong | 2008 | The interior of the staff hut with one of the staff machines, not long before the introduction of CTC. |
Gungal | 1986 | Repair work being performed on a culvert adjacent to the level crossing. This is the view looking towards Sandy Hollow. |
Gunnedah | 2007 | A view of the ash pit on the No 2 Loco Road. |
Gunnedah | 2007 | The interior of the station master's office, showing the staff machines for the next and previous sections. |
Gunnedah | 2007 | The last remaining original window in the station building. |
Hanbury Junction | 2008 | The view looking back along the formation to the former junction location. |
Hanbury Junction | 2008 | A symbol in the path, a reminder of the location's original function. |
Hanbury Junction | 2008 | The view from Loma Street looking back towards the junction. The main line is hidden behind the bushes in the distance. |
Hanbury Junction | 2008 | The view looking west as the formation traverses a gully before entering the University grounds in the distance. |
Hanbury Junction | 2008 | Another interpretative symbol in the pathway. |
Hawkesbury Bridge Platform | 2008 | The view of the short worker's platform at the northern portal of the Long Island tunnel. |
Hawkesbury Bridge Platform | 2008 | The short worker's platform at the south end of the railway bridge over the Hawkesbury River. |
Hexham | unknown | A closer view of the signal box, taken about a month before it was closed. |
Jct (Waratah No 2 Quarry) | 2008 | The view looking north-west back towards Hanbury Junction. The line entered from centre distance and curved around to the left. |
Jct (Waratah No 2 Quarry) | 2008 | The line then heads south along an overgrown embankment. |
Jct (Waratah No 2 Quarry) | 2008 | A small culvert still survives under the formation. |
Jct (Waratah No 2 Quarry) | 2008 | The formation then heads through school grounds. |
Kerrabee | 2008 | A view of the staff hut as CTC safeworking is in the process of being introduced. |
Merah North | 2007 | The view looking up the line towards the station. The loop line that served the platform has long been lifted. |
Merriwa | 1984 | 48125 at the head of a short goods train sits in the station. |
Merriwa | 1984 | An early moring shot of Merriwa yard just just before starting the shunt. |
Moree | 1990 | The view looking south from an engine leaving Moree. On the left can be seen Moree Loco. Behind the white fence at the far left is the siding leading to the turntable. In the distance, the main line in on the right, with the Inverell branch on the left. |
Muswellbrook | 1986 | A photograph of Muswellbrook Loco was taken from the departing 5202 train. |
Muswellbrook | 1986 | Muswellbrook Signal Box around 1986. The shunters humpy is visible on the left of the shot. |
Muswellbrook | 1984 | A view of the inside of the signal box showing the control panel. |
Muswellbrook | 2008 | The platform that served the adjacent stock yards. Half the platform is concrete and the other half is sleepers in a advanced state of decay. |
Muswellbrook No 2 Colliery | 1987 | A 47 class loco at the head of a train being loaded. Water vapor from Bayswater Power station is plainly visible. |
Muswellbrook No 2 Colliery | 1987 | Loading operations being performed by a front end loader. |
Narrabri | 1990 | The Excelsior Flour Mill, adjacent to the station. The fence, the mill and the building in this photo are now all removed. |
Narrabri | 2007 | The interior of the signal box, showing the yard diagram, lever frame, and the staff instrument, complete with anti-tamper clamp. |
New Tunnel Junction | 2008 | The view looking towards the former location of New Tunnel Junction. The line back to Newcastle extended along the road on the right background. The line continued towards Wallsend, out the left hand side of the picture with the branch to Elermore Colliery behind the camera. |
New Tunnel Junction | 2008 | The view looking down the formation towards Wallsend. |
New Tunnel Junction | 2008 | The view looking down the formation towards the location of Elermore Colliery. |
Nundah (2nd) | 2008 | The view looking in the down direction towards the location of the former station, in the vicinity of the tonnage signal. The original alignment used to travel in a straight line up the hill through the middle of the mine. |
Padulla | 2007 | The building that was used when Padulla was the site of emergency crossovers in the late 1980s. |
Padulla | 2007 | Signs on the pole noting that this is the former Padulla Staff Hut. |
Padulla | 2007 | The half-kilometre post at the location of the former staff hut location. |
Padulla | 2007 | Some concrete blocks left over from some earlier structures. |
Pelton Colliery | 2008 | The staff and ticket box at the Penton Signal Box. |
Raspberry Colliery | 2008 | The remains of this bridge near Georgetown Road have probably been destroyed now, due to drainage modifications. This short section of about 1.4 kms of track is all that remains of the Gully Line railway. |
Ravensworth | 2008 | The location of the former island platform, looking in the up direction just past the Hebden Road level crossing. |
Rixs Creek | 2007 | The formation near where it meets the current deviation. |
Rixs Creek | 2007 | The old formation is now a 4WD track. |
Rixs Creek | 2007 | The remains of the brick-faced platform. |
Rixs Creek | 2007 | A survey marker embedded in the platform face. |
Rixs Creek | 2007 | The remains of the brick-faced platform. |
Rixs Creek | 2007 | The view looking down onto the platform. |
Sandgate Cemetery | 2006 | The remains of the branch line where it curves towards the cemetery behind Sandgate Station. |
St Heliers | 1988 | After saint heliers signal box was destroyed by a run away coal train there was a temporary signal box erected; this was used for about 2 years. |
Ulan Loop | 2008 | The staff machines in the Ulan staff hut. |
Ulan Loop | 2008 | The track indicator diagram in the staff hut at Ulan. |
Ulan Loop | 2008 | The interior of the staff hut. |
Wallsend | 2008 | A sign describing the preserved goods shed. |
Wallsend | 2008 | A 2 wheel coal wagon sits outside the preserved goods shed. |
Waratah No 2 Quarry | 2008 | The end of Eldon Street, where the line entered the quarry. |
Waratah No 2 Quarry | 2008 | The sealed entrance to the Waratah No 2 Colliery shaft, situated at the quarry entrance. |
Waratah No 2 Quarry | 2008 | Today, the quarry is partly used as an archery range. |
Waratah No 2 Quarry | 2008 | The remains of some points in the quarry itself. |
Wee Waa | 1990 | A photograph of the station when it was still manned. |
Werris Creek | 1988 | The metal signwork at the entrance to Werris Creek Loco. |
Willow Tree | 1990 | A view of the station with three modified 45 classes doing bank enging work. |
Wondabyne | 2007 | A view of the short down-side platform, with standard Cityrail amenities. |