Sorry, user registration is not yet available!

NSW Railway Photos owned by David Sweeney

[Display as: Thumbnails Order by: Location]

Tamworth 1997 The yard diagram at West Tamworth. The former branch to Barraba enters from the right bottom.
Merah North 1998 The yard diagram at Merah North.
Quipolly 1998 The local control panel at Quipolly.
Spring Ridge 1998 The location diagram inside the signal box.
Togar 1998 The local panel at Togar signal box.
Armidale 1999 A closer view of the yard diagram at the station.
Boggabri 1999 A view of the yard diagram.
Emerald Hill 1999 A view of the yard diagram inside the signal boz.
Kootingal 1999 The yard diagram at lever frame on the platform.
Ulan 1999 The signal control board at Ulan, controlling the entry and exit of trains from the Ulan Coal Loader balloon loop.
Central 2000 A view of the yard control panel showing the country platforms.
Concord West 2000 A view of the interior of the old signal box.
Glenbrook 2000 A close-up view of the track indicator panel at Glenbrook.
Lidcombe 2000 A view of the interior of the old Lidcombe signal box, including the train indicator diagram.
Springwood 2000 The signaller's control desk at Springwood.
Wollongong 2000 The large signal control room at Wollongong.
Berowra 2001 The local panel at Berowra station.
Bondi Junction 2001 The local panel at Bondi Junction station.
Liverpool 2001 The diagram inside the signal box at Liverpool.
Martin Place 2001 The local panel at Martin Place station.
Parramatta Road Crossing 2001 A more modern version of the control panel inside the signal box.
Penrith 2001 A view of the signaller's control desk at Penrith.
Redfern 2001 A view of the indicator panel serving platform 12.
Rhodes 2001 A view of the emergency panel at Rhodes.
Richmond 2001 The signal control board at Richmond.
St Marys 2001 A view of the signaller's control desk at St Marys. Of note is that this is the point where the Main West reduces fro 4 tracks to 2.
Waterfall 2001 The signaller's control desk at Waterfall.
Cronulla 2003 The station master's desk and signal diagram.
Harden 2003 A signalling diagram of the section between Bowning and Harden.
Harden 2003 The train indicator diagram in Harden North signal box.
Harden 2003 The train indicator diagram in Harden South signal box.
Mindaribba 2003 The local control panel at Mindaribba.
Newbridge 2003 The local control panel at Newbridge.
Orange 2003 The diagram inside the signal box at Orange.
Queanbeyan 2003 The signal diagram for F Frame.
Queanbeyan 2003 The signal box diagram in 2003. The up dock siding and associated crossovers have been excised from the diagram.
Temora 2003 The Temora yard diagram.
Berrima Junction 2004 The train indicator diagram at the junction between the main line and the branch to the Berrima Cement Works.
Bundanoon 2004 A closer view of the station diagram.
Bundanoon 2004 The station diagram and safeworking instrument behind the lever frame.
Fassifern 2004 The train indicator diagram at Fassifern.
Fassifern 2004 The control panel at Fassifern, controlling the branch to the nearby Newstan Colliery.
Minimbah 2004 The local control panel at Minimbah.
Oatley 2004 The indicator diagram at Oatley station.
Oatley 2004 The signaller's clearing point list instructions at Oatley.
Picton 2004 The yard diagram at Picton.
Picton 2004 The train indicator diagram and lever frame at Picton signal box.
Sefton Park South Junction 2004 The diagram and points levers inside Sefton Park Junction signal box.
Sefton Park South Junction 2004 The lever pulling list onside the signal box.
Sulphide Junction 2005 Part of the large control panel at Sulphide Junction.
Sulphide Junction 2005 Part of the large control panel at Sulphide Junction.